top of page
Project: Brooklyn Bridge Grid Manufacturer: LB Foster
Location: NYC, NY Contractor: Yonkers(main span) - Skanska(approach spans)
Install Date: 2000 main span - 2010 approach spans Design Engineering Company: WEI Bridge Owner: NYCDOT
Project Description: Main span redecked in 1999 using 130 nights of construction (11PM - 6AM ) keeping bridge fully open at all other times. Approachs were redecked in 2010 using similar techniques with steel grid bridge deck panels precast with concrete to speed construction.