• Home

  • Product Details

    • Deck Types
    • Typical Uses
    • Filled Grid Details
    • Open Grid Details
    • Exodermic Details
    • Installation/Fabrication Tolerance
    • A Bridge to the Future
    • Recommended Coatings
    • Gridlines
    • Techlines
  • Grid Decks in the News

  • Deck Studies/Research

  • BGFMA Fabricators

  • Projects

    • Chelsea Viaduct
    • Bunge Grain Elevator
    • I-895 over Patapsco River Flats
    • Wildlife Guard
    • Globe Metalurgical Plant Floor
    • Dyer Avenue
    • North Grand Island Bridge
    • NJ Route 37 EB Mathis Bridge
    • I-81 over Leitersburg Road
    • Newburgh-Beacon Bridge
    • I-20 over Alcovy River & Alcovy Watershe
    • Memorial Bridge
    • Walt Whitman Bridge
    • Scott Road over Montour Run
    • Arrigoni Bridge
    • George Sellar Bridge
    • Boston Bridge
    • South Grand Island Bridge
    • Ben Sawyer Swing Bridge
    • NW 12th Avenue Bascule Bridge
    • Thomas J. Hatem Memorial Bridge
    • Henry Hudson Bridge
    • Cornelia Munoz Bridge
    • Manhattan Bridge
    • Robert C. Beach Memorial Bridge
    • NJ State Route 35
    • Mathews Bridge
    • 3rd Avenue Bridge
    • Hood River Bridge
    • Lambertville Bridge
    • Perth - Andover Bridge
    • Route 1 & 9 Lift Bridge
  • File Share

  • Members

  • More

    Use tab to navigate through the menu items.

    Approximately 34,000 square feet of steel grid bridge decking manufactured at L.B. Foster's Bedford, PA facility was used in the construction of the flooring system constructed by Boh Bros. Construction Co.  The steel grid decking was spec'd as part of the dock construction for Bunge North America's new grain elevator system to improve the Destrehan, LA facility's export productivity and capacity.

    Chat
    • Facebook
    • Linkedin